Leading the future of clean energy
The company has a 30,000-square-meter professional modular prefabricated cabin production workshop with 102 employees. It has an annual production capacity of 9,000 sets of various camping cabins and prefabricated cabin units. The factory has a complete and efficient prefabricated cabin production line, employing the most advanced manufacturing processes in the industry
Learn More
30000㎡
Spacious workshop, ample production.
102+
Skilled team, comprehensive support.
9000+
Large-scale production capability
120million
Strong market competitiveness
Prefabricated Single-Unit Electrical Equipment Cabin
Prefabricated modular electrical equipment modules are integrated units that combine single or complete sets of electrical equipment (such as switchgear, transformers, energy storage batteries, SVG/STATCOM, etc.) with environmental control systems within a single steel structure in a factory.
Learn More
Integrated Prefabricated Substation Cabin
Prefabricated Modular Electrical Equipment Containers (hereinafter referred to as "prefabricated containers") are modular substation/distribution solutions that integrate primary and secondary electrical equipment and auxiliary systems, including high-voltage, low-voltage, protection, control, and communication systems, into standardized steel structure containers prefabricated in a factory.
Learn More
Multi-story Prefabricated Electrical Equipment Cabin
Multi-layer prefabricated electrical equipment cabins, simply put, are steel structure cabins that house the primary and secondary high-voltage/low-voltage equipment of traditional substations, arranged in two (or three) layers.
Learn More
Prefabricated energy storage modules are highly integrated, modular, factory-prefabricated outdoor energy storage systems and are currently the mainstream solution for large-scale energy storage projects.
Learn More
Vehicle-Mounted Prefabricated Cabin
Prefabricated vehicle-mounted modules are mobile equipment that integrate modular functional cabins with a vehicle chassis. Their core features are factory prefabrication and overall transportation, and they are widely used in power, communication, emergency response, and scientific research fields.
Learn More
Engineering Design Capabilities
Manufacturing Capabilities
Quality Control Capabilities
Equipment Display
Nov. 02, 2026
How UPS Systems Can Be Integrated into Data Center E-House Solutions
Integrating an uninterruptible power supply into a Data Center E House does not need to become a complex redesign project. In this guide, I will show you how to calculate the UPS requirement, select the correct topology, reserve space inside Prefabricated Electrical Enclosures, coordinate batteries and cooling, complete factory testing, and commission the system safely. By following these
Oct. 30, 2026
How to Select the Right E-House Supplier for a Data Center Project
Selecting the right Data Center E House supplier requires more than comparing product prices. Purchasing teams must confirm technical compliance, factory capability, delivery reliability, lifecycle cost, and the supplier's ability to manage risks from design through commissioning. This guide explains a practical, step-by-step method for evaluating suppliers and choosing a qualified partner such
Oct. 29, 2026
Weatherproofing and Environmental Protection for Outdoor Data Center E-Houses
Outdoor data center E-Houses must protect servers, batteries, switchgear, and control systems from rain, dust, heat, and corrosion. A reliable design combines an outdoor data center enclosure, thermal management, and corrosion protection. The right weatherproofing plan also uses an IP rating, drainage system, insulation, and tested HVAC equipment. These measures help reduce downtime, maintenance
Get a free quote anytime
If you would like to learn more about our products or are looking for a suitable prefabricated cabin solution, please contact us.